The Scope of work for this contract includes: Removal of sediment buildup from the drainage ditch systems and drainage structures; Clear and grub drainage ditches; Any and all survey and work associated; Regrade ditches to maintain sufficient slope to rain water away from the WSA; Fill and compact eroded areas of drainage