A mulit-story tower and all its associated storage facilities are to be leveled, removed, and finished 12 inches below grade on the ABI local air field. Disconnection and capping of all connected utility lines (water, sewer, electrical) and the safe removal of hazardous materials (asbestos) are part of the work scope. A Stormwater Pollution Prevention Plan is implemented to ensure environmental compliance.